Help with your seawall project·Daytona Beach
Daytona Beach Shores · Your waterfront project

Seawall repair in Daytona Beach Shores

Prepare seawall repairs in Daytona Beach Shores with CivicGov records, city permit requirements, coastal setbacks and county beach/dune review. Plan the full scope.

Describe your project on this page ↓
Daytona Beach Shores waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.Daytona BeachShoresSouth DaytonaWilbur-by-the-SeaDaytonaRiverfrontDaytona Beach Shores waterfront mapNorth is up. The accent marker identifies the selected community. Choose a community label to open its local guide. Nearby guide links also appear below the map.Daytona BeachShoresSouth DaytonaWilbur-by-the-SeaDaytonaRiverfront
U.S. Census Bureau: county land minus areal hydrography; street address-range reference points and Ormond-by-the-Sea CDP. Snapshot October 25, 2026. Approximate orientation only; not a survey, flood map or service-availability boundary.

At a glance

  • Search CivicGov for existing permits and request the approved plans.
  • Ask the Shores to interpret the coastal setback rules for the parcel.
  • Include beach access and walkovers in county and state review.

Get to know your waterfront

Daytona Beach Shores has its own Building Division and permit system. Its published list explicitly includes seawall installation, repair and replacement. For oceanfront condos and hotels, coordinate the wall with pool decks, resident access, utilities and dune work. The city’s coastal building setback provisions are not a ready-made seawall height requirement. Ask the city to apply the relevant district rules to the survey and proposed scope.

Daytona Beach Shores Building Division · Daytona Beach Shores online permit portal · Daytona Beach Shores supplementary regulations · Volusia beach-access repairs, May 10, 2024 · Volusia coastal park locations

Keep the building setback and wall design separate

Have the survey identify the wall, principal building, pool/deck and access structures. The coastal setback provisions distinguish district types and contain exceptions, including seawalls. A single “50-foot rule” quoted without the section’s context can send the design discussion in the wrong direction.

For an association, ask the engineer to identify whether adjacent building or deck distress needs a separate evaluation. Keep occupied routes, emergency access and construction staging in the bid brief.

Local records to bring into the conversation

  • Daytona Beach Shores explicitly lists seawall installation, repair and replacement among projects requiring permits.
  • The Shores Building Division lists 386-763-5377 and 2990 S. Atlantic Avenue.
  • The Shores directs users to CivicGov; registered users can search active, pending and closed permits.
  • The Shores coastal setback provisions distinguish multifamily/hotel districts from single-family districts and list seawalls among exceptions to the structure prohibition.
  • The May 2024 county update records permanent repairs to Minerva vehicular beach access in Daytona Beach Shores.
  • Volusia locates Frank Rendon Park at 2655 S. Atlantic Avenue in Daytona Beach Shores.

Daytona Beach Shores Building Division · Daytona Beach Shores Building Division · Daytona Beach Shores online permit portal · Daytona Beach Shores supplementary regulations · Volusia beach-access repairs, May 10, 2024 · Volusia coastal park locations

Coordinate the wall and the occupied property

Give the reviewer and designer a plan locating the seawall, building, pool deck and beach access. Keep building setbacks and wall elevations labeled as different measurements.

  • Which access routes are affected?
  • What inspection or survey information is still missing?
  • Which parts of restoration are included in the bid?

Request the approved plans from the Shores’ own permit record. County access-repair records can explain a neighboring public structure, but they do not describe the entire private property.

Daytona Beach Shores online permit portal · Daytona Beach Shores supplementary regulations · Volusia beach-access repairs, May 10, 2024

Find the relevant permits and records

Daytona Beach Shores researched starting points
Starting pointWhat to resolvePrepare and look up
Daytona Beach Shores Building Division
Seawall permits, plans and inspections.
386-763-5377; 2990 S. Atlantic Avenue; use the city-linked CivicGov portal.
Volusia Environmental Management
Beach and Dune review in addition to other approvals.
Include dunes, armoring, access and walkovers; specialist: 386-238-4773.
Florida DEP coastal program
CCCL and coastal armoring questions.
Volusia CCCL: 850-245-7680. Statewide armoring: 850-245-8419.

Prepare the questions for the responsible office.

What could the work cost?

Compare a complete occupied-property scope: engineering, coastal approvals, temporary barriers, deck or walkover work and restoration. Do not assume the City of Daytona Beach fee waiver applies in the Shores.

Start with published Florida price ranges, then refine the budget with a written quote for your property.

Compare quotes and plan a budget →

Prepare a coordinated oceanfront package

Use this sequence to prepare the property file and resolve the local questions.

  1. Retrieve CivicGov records

    Search active, pending and closed permits, then request missing approved plans.

    Daytona Beach Shores online permit portal

  2. Resolve district rules

    Have the city interpret the coastal setback provisions for the actual property.

    Daytona Beach Shores supplementary regulations

  3. Include beach access

    Identify affected walkovers and the proposed construction route in county and DEP discussions.

    Volusia County Beach and Dune Permit · Volusia beach-access repairs, May 10, 2024

Start with what you know

Prepare your Daytona Beach Shores project notes

Record the address, water frontage, visible concern and any decision deadline. Add existing plans and photographs when available.

You don’t need to know the repair yet. Start with what you’ve noticed.

Getting your form ready…

Daytona Beach Shores project questions

Does a small seawall repair avoid a Shores permit?

The city lists seawall repair among permit-requiring work. Ask the Building Division to confirm the correct application for the complete proposed repair.

Daytona Beach Shores Building Division

Is the 50-foot coastal setback the height of my seawall?

No. It is a building-setback provision in specified districts, with its own exceptions. Wall elevation and engineering must be resolved separately.

Daytona Beach Shores supplementary regulations

Keep planning

Nearby waterfront guides

Daytona Beachside, Wilbur-by-the-Sea, Port Orange

View the local guide directory.

Show sourcesHide sources
  1. Daytona Beach Shores Building DivisionSource reviewed 2026-10-25
  2. Daytona Beach Shores online permit portalSource reviewed 2026-10-25
  3. Daytona Beach Shores supplementary regulationsSource reviewed 2026-10-25
  4. Volusia beach-access repairs, May 10, 2024Source reviewed 2026-10-25
  5. Volusia coastal park locationsSource reviewed 2026-10-25
  6. Volusia County Beach and Dune PermitSource reviewed 2026-10-25
  7. DEP CCCL managersSource reviewed 2026-10-25