Planning a seawall replacement

By Daytona SeawallUpdated: 2026-10-26

Replacement starts with a survey and a design for the property. Wall alignment, ground levels, access and nearby structures affect both the approval route and the construction scope.

At a glance

  • Compare replacement with any supported repair option.
  • Confirm the proposed wall line, elevations and neighboring connections.
  • Price demolition, temporary works and restoration as well as the new wall.
About 2 min readOfficial sources linked below

Resolve alignment and height before choosing material

A new wall changes more than its exposed face. The designer needs the property survey, existing alignment, elevations, retained ground and neighboring transitions. A proposal to move waterward or raise the cap can change the authorization and design questions.

Bring the exact survey datum. A height measured above today’s river level cannot be compared directly with a NAVD88 elevation.

NOAA survey datum questions · DEP ERP e-Permitting

Ask how the site stays supported during construction

Have the contractor explain demolition limits, temporary retention, equipment position and protection for docks, utilities and nearby improvements. Ask which parts require an engineer’s temporary-work design and who approves changes discovered after removal.

  • Can equipment reach the wall from land, or is marine access needed?
  • Who authorizes use of a neighbor’s parcel or public access?
  • Where will demolition material and imported fill be staged?
  • How will occupied areas remain separated from construction?

Keep the beachfront and riverfront routes distinct

Daytona’s building checklist includes FDEP approval. Oceanfront armoring also calls for a CCCL discussion and Volusia’s Beach and Dune review. Ask each authority to review the same alignment, length, access and associated work.

Daytona Beach permit types and documentation · Volusia County Beach and Dune Permit · DEP CCCL managers

Price the completed project

Ask the price to include or explicitly exclude survey, engineering, old-wall removal, dewatering, drainage, docks, permit charges and restoration. Request final inspections, as-built information where required, and a maintenance handoff.

Daytona identifies a separate construction dewatering route. Include the discharge plan in the scope if the contractor proposes working in the dry.

Build your budget from the written quantities and rates.

If the recommendation is still uncertain, review the repair or replacement decision guide. Once the scope is defined, use the Daytona permit workflow to organize the approval questions.

Daytona Beach construction activity and dewatering

What should the construction-access plan explain?

Replacement can affect far more than the strip beside the water. Have the provider walk through the proposed route on a plan before you rely on the price.

Getting in

Show the gate or marine approach, equipment position and staging area. Identify any neighboring land or public access that needs separate permission.

Keeping services working

Mark drainage, dock power, water lines and any planned isolation. Name who coordinates outages and who restores each service.

Leaving the property usable

List the paving, landscape, dune or walkover work affected by construction. Define the restoration finish and what is excluded.

Check the wall ends too

Ask the designer to show how the replacement meets the adjoining walls and ground. If neighboring work is not part of this contract, the proposal still needs an explanation of the transition and any access dependency.

Volusia County Beach and Dune Permit · FEMA shorelines mitigation fact sheet

Show sourcesHide sources
  1. NOAA survey datum questionsSource reviewed 2026-10-25
  2. DEP ERP e-PermittingSource reviewed 2026-10-25
  3. Daytona Beach permit types and documentationSource reviewed 2026-10-25
  4. Volusia County Beach and Dune PermitSource reviewed 2026-10-25
  5. DEP CCCL managersSource reviewed 2026-10-25
  6. Daytona Beach construction activity and dewateringSource reviewed 2026-10-25
  7. FEMA shorelines mitigation fact sheetSource reviewed 2026-10-25

Let’s work out your next step.

Tell us where your property is and what needs attention.

You don’t need to know the repair yet. Start with what you’ve noticed.